The Nebraska Department of Roads will hold an Information Open House Thursday, July 19th, regarding improvements to U.S. Highway 136, in and east of Auburn. The open house will be held from 4:00 to 6:00 p.m. at the Auburn Senior Center, 1101 J Street, in Auburn.
These two projects, In Auburn and Auburn East, would be constructed in Nemaha County.
The In Auburn project involves rebuilding 1.38 miles of US-136 from 600 feet west of Co. Rd. 638th Avenue on the west side of Auburn by the Sheridan Cemetery through “F” Street. Improvements include pavement removal and replacement as required to the existing width, as well as spot
improvements at intersections. Additional improvements include restriping for three lanes, storm sewer and curb inlet replacement, and sidewalk reconstruction, including American with Disabilities Act compliant curb ramps as needed.
Construction is proposed in four “phases” from west to east, with the use of temporary roads to accommodate local traffic. Construction would require detouring US-136 traffic. Local traffic would be detoured through town, while thru highway traffic will be directed onto other state highways. U.S. Highway 75 traffic would also require detouring for a limited period. Maps and more information on detouring will be available at the meeting.
The proposed Auburn East project involves resurfacing 9.73 miles of US-136 from “F” Street in the city of Auburn, through the village of Brownville to the west end of the Missouri River Bridge. Primary improvements include concrete pavement repairs and resurfacing the asphalt to the existing width. The project would be built without detouring US-136 traffic, with appropriate traffic control measures, but would be done concurrent with the In Auburn project detouring.
Construction could start as early as spring of 2014, depending on available funding and design. Work is anticipated to be completed in late fall of 2014.
Personnel from the State Department of Roads will be available to answer questions, receive comments and discuss any aspect of the proposed highway improvement project.
Information regarding the project will be available after the meeting on the NDOR website at www.transportation.nebraska.gov/projects/ by clicking on the “Auburn” link.
© Many Signals Communications
MOST VIEWED STORIES
Sabetha couple killed in Brown Co crash
Dean, assistant, secured for proposed BC med school
Registered drug offender returned to Atchison Co Jail
Injuries, damage averted in Sabetha house fire
Trump thankful for late Deputy's service, sends Brown Co letter
Spilled mower fuel blamed for Atchison fire
Atchison man pleads not guilty to charges in Brown Co case
Two arrested after Humboldt search warrant
Richardson County Board denies grievances
Flags to fly at half-staff in honor of fallen firefighters
Former Atchison Co Commissioner passes at 97
Mayetta man faces child sex-crimes in Shawnee Co
Additional Nemaha County filings
Ceremony Tuesday for historic Lady Ravens victory
Richardson Co board conducts grievance hearing
Atchison Memorial Hall future focus of May 13 mtg
U.S. 75 project to begin Monday in Brown Co
LATEST STORIES
One person injured in Brown Co rollover crash
Two killed in two-vehicle Otoe County crash
Project to begin Monday on U.S. 36 in Fairview
U.S. 75 project to begin Monday in Brown Co
Community survey assessed by Atchison leaders
Drowning concerns grow as summer approaches
Mayetta man faces child sex-crimes in Shawnee Co